Pertanyaan

1. How long did it take to complete the bridge? Text 1 Ampera Bridge is a vertical-lift bridge in the city of Palembang, South Sumatera, Indonesia. It is not only a landmark of the city but also reflects the nation's political aspirations. The bridge was initially called Bung Karno bridge It was constructed in April 1962 and officially opened on September 301965. It measures 1,177 meters long and 22 meters wide. Palembang. It has two lifting towers at 63 meters tall, with a distance of 75 meters between the two. This bridge once had a retractable section, which could be lifted to make way for tall ships to sail through. The section was powered by a 500-ton pendulum ballast lifter, which could fully lift the bridge to make way for ships. However, this section is no longer opened to allow ships through because of the time-consuming process and for safety reasons. People nowadays use the areas at both sides of the river for recreational activities. A. One year B. Two years C. Three years D. Four years E. Five years 10 poin

Solusi

Terverifikasi Ahli
4.3 (167 Suara)
Vandan elit ยท Tutor selama 8 tahun

Jawaban

The correct answer is **B. Two years**.Here's how we arrive at the answer:* The text states the bridge was constructed in April 1962 and officially opened on September 30, 1965.* To calculate the time taken, we need to find the difference between these two dates.* From April 1962 to September 1965, there are approximately two years. Therefore, it took approximately **two years** to complete the Ampera Bridge.