How to get a building permit for constructing a new building, demolishing existing structure, or rehabilitating existing buildings?

Solusi

Terverifikasi Ahli
4.2 (277 Suara)
Zayed master ยท Tutor selama 5 tahun

Jawaban

### A state-licensed architect or engineer submits plans to the DOB on behalf of a developer or builder. The DOB examiner shares any legal objections or other issues they find with the plans. The architect or engineer fixes the problems. If the examiner is satisfied, a permit is issued. The owner of the building pays for the permits.

Penjelasan

## Step1: Submission of Plans### A state-licensed architect or engineer submits plans to the Department of Building (DOB) on behalf of a developer or builder. This is the initial step in the process of obtaining a building permit. The architect or engineer is responsible for creating detailed plans that show how the building will be constructed, demolished, or rehabilitated.## Step2: Examination of Plans### The DOB examiner reviews the submitted plans and shares any legal objections or other issues they find with the plans. This step is crucial as it ensures that the plans comply with all relevant laws and regulations. The examiner's role is to identify any potential problems or issues that could prevent the building from being legally constructed, demolished, or rehabilitated.## Step3: Fixing Problems### After the examiner has shared their findings, the architect or engineer must fix the problems identified in the plans. This could involve making changes to the plans to comply with the examiner's recommendations or addressing any legal issues that have been raised.## Step4: Issuance of Permit### Once the architect or engineer has fixed the problems identified by the examiner, the DOB will issue a permit if the examiner is satisfied with the revised plans. This is the final step in the process of obtaining a building permit. The permit authorizes the developer or builder to proceed with the construction, demolition, or rehabilitation of the building.## Step5: Payment for the Permit### After the permit has been issued, the owner of the building must pay for the permits. This is the final step in the process of obtaining a building permit. The cost of the permit varies depending on the type and size of the building, as well as any additional services required by the DOB.